The digs

Sunday, March 6, 2011

More painting, ripping up floors, and cutting windows

Accomplished a lot this weekend!

First, our ceilings are finally finished being re-taped and mudded:

mudding and taping

ceiling

Now we have to paint the ceiling white, obvs.

Spare bedroom with finished walls and ceiling, getting carpeted this week:

spare room

Then, we cut a hole in the wall between the kitchen and living room. The goal is to make a window/breakfast nook. Here is how you make an interior window on a load-bearing wall:

Step 1: Cut a hole in the wall.

026

Step 2: Reroute any wiring.

028

Step 3: Insert a header

062

Step 4: Insert 2x4s on the sides

071

075

And voila! You have a window. It is being sheetrocked and framed in tomorrow! Will give you an update when I have one.

We also put a new ceiling in the bathroom. It is mildew/moisture resistant. This is not the finished ceiling, of course.

ceiling

We also ripped up the linoleum floor out of the kitchen. It was hard.

linoleum

Now we have lovely subfloor, ready for tiling:

kitchen

Then, we painted the walls of our small bedroom/office with primer.

IMG_0405

Finally, we primered the walls, closet, and floor of the master bedroom. Both rooms are now ready to be painted:

master bedroom

Here is the living room with its fresh paint:

IMG_0396

Did a little spending this weekend.

-electrical supplies (receptacles, plates, lightswitches), bathroom ceiling vent fan, hanger boxes, corner bead for the interior window $87.54

-drywall screws and door stops $46.53

-4 gallons of primer $54.76

-charge for the 2 1/2 tons of debris we put in the dumpster: $162.85

-first month’s electric bill: $94.62 (I’m including it because we’re not living there/it was a necessary expense to finish the place)

So basically I’m in it for $4634.39. Good times!


I was trying to clean the ceiling fan this afternoon and snapped a blade off, so now I need to buy a new one of those. Blah.

We did get a nice leather couch this weekend, though. Yay!

Thursday, March 3, 2011

Basement bar and some paint on the walls

First things first: Expenses.

-9 inch roller, 2 inch roller, 4 pack of disposable rollers, ten pack of disposable trays: $21

-Returned toilet: –131.96

-Motion sensor flood lights $13.00

-Toilet Seat 9.97

-light bulbs 5.97 + tax $1.81

-3 sheets of sheetrock (got a discount because 2 were damaged), and E-Z Sand 45= $37.11= $4188.09

Now for pictures of the progress so far:

bedroom

Here is the guest bedroom, freshly painted. The color is Sherwin Williams’s Sleepy Blue.

bedroom

Adam got a bar set for the basement for $50:

bar

wine holder

bar

The bar needs to be painted but it’s the first step toward the Ultimate Mancave.

living room

And here is the living room, freshly painted with Sherwin Williams’ Kilim Beige.

kilim beige

vaulted ceiling

And here’s the third wall. The fourth wall, which I don’t have a photo of here, is going to be a shade lighter.

A million thanks to Sara D. for helping paint! If anyone needs a professional painter, Sara does a great job.

Sunday, February 27, 2011

Removing wallpaper borders and painting ceilings

Not a hugely productive day today, but I did get some important things done, with the help of my mom.

We painted the ceilings of the living room, and it looks really nice!

living room ceiling

There were cracks in the ceiling, so they had to be mudded and retaped, and then we primed the ceilings and painted them white. It looks beautiful now.

Then I ripped down the pig border from the kitchen. It was a long, frustrating process, but we found that the best method was:

1) spray with Dif


2) scrape with a paint scraper/putty knife to get the top layer off

3)spray with water and peel off remaining glue



And now the kitchen looks like this:

kitchen without borders

I call it “Kitchen Without Borders.” It used to look like this:

IMG_0343

And the other wall, before:

IMG_0362

Same wall, after:

hole in wall

Goodbye, pigs!

pig border

Seriously, WHY would you put that in your house?

And here is the progress on the guest room:

IMG_0385


Adam made a good point-- that the pictures on the blog don't convey one of the biggest changes in the house, the smell. When we first bought it, you could barely stand to be in it, but now thanks to lots of cleaning and painting the floors with Kilz, it's starting to smell like a house!



As far as expenses go, I had to spend $51.14 on more painting supplies today, which means I've spent $4231.19 so my far. Eff my effing L.

So, that’s everything we got done today. I’m really, really looking forward to getting some color on the wall next weekend. I wish I didn’t have to work all week! I just want to paint!

Speaking of working, I’m starting a second job tomorrow, which means blogging and doing work on the house will be few and far between. But such is life.

Onward!

Saturday, February 26, 2011

Busy week of remodeling

Well, it has been a busy week, not only in my personal life but also with house-things.

First, my dad cut a hole in the wall of my kitchen.

kitchen window

living room window

It’s going to be a bar-style kitchen table, once it’s done, and I think it’ll really open up the space.

Mid-week, I selected all my paint colors, and purchased the colors from Sherwin Williams. The cost was $382.39 for all the paint needed for the interior of the house.

We also had an additional key made up for the house ($2.65), plus a Flex Joint Knife, painter’s tape, and Stain Killer ($49.89).

However, I returned the heat gun and paint scraper I bought from Walmart last weekend because they didn’t work (-$30.78).

But then while I was at Walmart to return the stuff, I bought a bunch of painting supplies ($40.00).

Last night I went to Home Depot to pick up a hot water heater ($232), a new toilet ($138), a water filter ($66.48), smoke detectors and carbon monoxide detector  ($13.35 and $17.78, respectively), a hose for the washer and dryer or something ($14.49), and a “Cop Vac Tee,” whatever that is ($8.57).

Now here’s the doozy. I went over to Lowe’s after that, and found a nice dishwasher in the “Scratch and Dent” section. I have been wanting to go to the local scratch and dent place, as I’ve heard great things, but the stupid place is never open when I’m not at work. And this was a $700 Bosch dishwasher on sale for $419, not including my dad’s military discount.

SO I decided to get the dishwasher, and since I was already spending a bunch, I decided I wanted this beautiful Whirlpool Stainless Steel range, which was priced at $499.

Except the cashier made a mistake when ringing me out, and I only ended up paying $830.50 for the pair, which was 20% off. Sweeeeet. Except Adam’s really mad at me because he thinks I should get lower-end appliances to stretch my budget further, so I’m sort of torn. And I have to spend an entire week being torn before I can check out the scratch and dent place in town next Saturday.

As for work done: Today I taped for painting, then primed the walls and ceilings of the living room and hallway, and also painted the floors of two of the bedrooms with Kilz to block the delightful cat urine odor that perfumes the house.

painting

Here I am painting.

My dad dragged me kicking and screaming back to Lowe’s, where I bought another $24.47 worth of stuff, which included light bulbs, a ceiling box, a solder adapter, a plastic sump check (because our previous one was the wrong size, and a flex-a-spout. Then I returned the old sump check ($-6.21), and it was back to work with me.

We pulled the old range out, and found some fun stuff lurking underneath it.

stove

trash

dirt behind stove

And here is what the guest room looks like with the subfloor painted. We did that to block the odor before we install carpet.

IMG_0376

And, a before and an after of the living room

IMG_0365

IMG_0378

Tomorrow I have to paint the ceiling in the living room white (it’s only primed so far), and prime the office/small bedroom, and hoooopefully I can start painting the living room the final color.

Whew! I got up at 7 AM to go to the gym, too, so that explains why it’s 8:45 PM and I’m ready for bed!


Oh, and my expenses have now ballooned up to $4180.05, leaving me with less than $900 left to finish the house. I'm pretty much screwed.

Monday, February 21, 2011

Odds and Ends

I neglected to tally up my expenses from the weekend in my last post, so I figured I'd do that now.

First, I bought a work jacket ($29.99):


and a nail puller($4.99):


The nail puller was invaluable for removing the staples that the previous owner of the house used to tack the carpet to the floor.

Then, it was off to Walmart, where we purchased sponges, mops, cleaning agents, a paint scraper, a heat gun,

scented candles, a sander, and a Brita water filter. The total was $99.37...eeep!

Aaannd today my dad picked up some 2x4 studs and a "flexspout" from Home Depot. I'm not even sure what the latter is, but these things cost me another $31.24.

$2396.47 is the new dent in my budget.

After work today I rushed over to Sherwin Williams. Those stores close at 6, and when I came in at 5:45, the clerk was pretty rude. I told him I was picking out some colors, and he said, "You know we close in 15 minutes, right?"
"Yes," I told him. "Your hours are inconvenient for people who work. But don't worry, I'll be fast."
I chose some chips, just in time for the clerk to say, "Ma'am, you know we close in 1 minute?"
"Yes," I responded. "I'll buy these elsewhere tomorrow," and whisked myself and my paint chips out the door triumphantly.

I took the paint chips home, and agonized for close to two hours over different shades of tan, green, and blue (I'm going for neutral earth tones). I'm terrible at making decisions (as I write this I'm debating swapping "Sleepy Blue" for "White Truffle" for the guest room), and I often rely on input from others for such decisions. Unfortunately, Adam is one of those "Whatever you think, honey" decision-makers, which I was NOT finding helpful. His only real input was "Nothing purple or yellow. Oh, and nothing girly." Great.

Anyway, after much deliberation, we did finally choose some lovely (albeit innocuous) colors, and we are ordering them from Sherwin Williams tomorrow.

I really, really hope they look okay up on the walls.

By the way, because a couple people have requested that I do so, I'm adding a Donation button to the blog. Every penny counts and will go towards improving the house and making it livable. :)





Sunday, February 20, 2011

Another day of working: cleaning, cleaning, and more cleaning

Despite Adam and I spending all day working on the house today, with help from Adam’s friend Tristan, I felt like we didn’t accomplish much.

Adam and Tristan cleaned the basement some more and took screws out of the ceiling. They also cleaned out the sump well and ripped down some framing. “The basement’s completely done now,” says Adam.

Meanwhile, I was upstairs scrubbing the cabinets in the kitchen and bleaching the walls in the kitchen. I also spent a lot of time pulling staples out of the floor. Then I scrubbed the wood trim, and the rafters, which had gotten some ceiling “stuff” on them from our ceiling-fixy guy.

Not the most productive day, but it all had to be done.

kitchen

This was the kitchen yesterday. There is crap everywhere, obviously. There are no other surfaces to put stuff on.

And this is the kitchen after an extreme scrubbing today:

kitchen

Not sure if you can tell the difference in the photos, but I thought it looked a lot better.

Here is the freshly-scrubbed, freshly-ceilinged, freshly-patched living room:

living room

IMG_0358

For reference, here is what it looked like when we first bought it:

living roomceilingceiling

ceilingceiling

As you can see (or maybe you can’t, it’s hard to tell in photos), it is looking better. All we need is a bit of paint and some laminate flooring and the living room will be set.

Hopefully the painting will commence this week and we will be one step closer to move-in!

Prepping for Paint

Well, we got some stuff accomplished yesterday.

First, we scrubbed the walls with bleach, and then with TriSodium Phosphate, to clean and prepare the surface for painting.

Before:

wallsbefore

dirtywalls

dirtywalls

After:

cleanwalls

Master bedroom before:

grosswalls

dirtywalls

dirtywalls

dirtywalls

dirtywalls

Grooooossssssss.

So armed with masks and gloves, I scrubbed down those suckers. Here is the result:

walls

Not perfect, but definitely better, and ready to be painted over.

In the meantime, my dad, Kim, Alex, and Erica had a fire going outside.

fire

They were clearing the brush out of the yard. This yard needs tons of landscaping, as you can see:

yard

yard

yard

dog

Mulligan patrols the perimeter

Hopefully we will be more productive today. I am housesitting, which means I’m not really able to post from my blog, and I almost threw in the towel with blogging last night when I discovered that Google disabled my AdSense account and took back my $80 in earnings from advertisers. As you can see, I have signed up with several new ad providers, but I am still fist-shakingly angry with Google. Grrrr!