The digs

Monday, April 25, 2011

But I want a real kitchen Geppetto

The kitchen is coming along beautifully!!!

The fridge was delivered today…albeit with a dent—so I’m calling Lowe’s in the AM to see what we can do about that:

IMG_0733IMG_0734

The new fridge looks fabulous indeed, even with its nerdy protective covering still on.

IMG_0736

IMG_0737

Adam shows off his new beer cooler

IMG_0738

We slid the dishwasher into place, but it’s not installed yet.

IMG_0741

And the stove, who also practices safe sex.

I’ve spent a crapload of money:

-angle grinder, bullnose tile, water bottles, ceramic tile file, tile cutting blade…$141.85 (-$49.54 because we returned that tile)

-more bullnose tile (the first kind wasn’t tall enough), 2 more cases of Pergo flooring…$90.65 (-18.61 for the case we returned because we didn’t need it after all)

-more underlay for the flooring, cabinet pulls, transition strips, wall plates, mounting bracket, door stop, drawer pull template…$135.23

-pencils, saw for cutting door trim…$29.07

-refrigerator, ice maker kit, ice maker supply hose…$498.88

======

$8447.16 spent on improving the house and making it liveable

I recently heard the term “house poor,” and I totally get it. Now I’m horse poor and house poor.

1 comment:

  1. I feel your pain on the $$ front.

    The fridge looks great! Hopefully they will reimburse you a bit of money for the dent.

    ReplyDelete